Flowserve MX/QX Profibus DP/PA Field Unit Bedienungsanleitung Seite 28

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 88
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 27
PB DPV1 / PA Field Unit Installation and Maintenance FCD LMENIM2336-03 – 12/12
28
3. Cut away the foil shield. Strip the insulation from the conductors approximately 0.4 inch (1 cm)
as shown in Figure 2.16.
Figure 2.16 – Stripping Conductors
4. Apply heat-shrink tubing to insulate the braided shield and to provide stress relief to the cable as
shown in Figure 2.17.
Figure 2.17 – Applying Heat-Shrink Tubing
a
CAUTION: Do not melt the insulation during the application of heat-shrink tubing.
5. Install ring tongue connectors as shown in Figure 2.18.
NOTE: Flowserve recommends the use of Thomas and Betts #RZ22-6 for optimum results.
Seitenansicht 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 87 88

Kommentare zu diesen Handbüchern

Keine Kommentare