
WDX USER INSTRUCTIONS ENGLISH 71576322 06-05
Page 3 of 46
INDEX
PAGE
Additional sources (10.3)......................................45
Alignment of shafting (see 4.3, 4.5 and 4.7)
Assembly (6.10)...................................................37
ATEX marking (1.6.4.2)..........................................7
CE marking and approvals (1.2)..............................4
Certification (9)....................................................45
Change notes (10.2)............................................45
Clearances (see 6.7, Renewal clearances)............32
Commissioning, start-up, operation (5)..................22
Compliance, ATEX (1.6.4.1)...................................6
Configurations (3.1) .............................................12
Copyright (1.4).......................................................4
Coverage charts (3.6) ..........................................15
Design of major parts (3.3)...................................13
Direction of rotation (5.3)......................................24
Disassembly (6.8)................................................32
Disclaimer (1.3).....................................................4
Dismantling (see 6.8, Disassembly) ......................32
Drawings (8)........................................................40
Duty conditions (1.5)..............................................4
Electrical connections (4.8)...................................21
End of product life (2.5)........................................12
Inspection of components (6.9).............................36
Fastener torques (6.6)..........................................32
Faults; causes and remedies (7)...........................38
Foundation (4.3)..................................................16
Forces and moments (4.6.3).................................20
General arrangement drawing (8.5).......................45
Grouting (4.4)......................................................17
Guarding (5.4).....................................................24
Handling (2.2)......................................................10
Hydraulic, mechanical and electrical duty (5.9) ......27
Inspection (6.2.1 and 6.2.2)..................................29
Installation (4)......................................................16
Lifting (2.3)..........................................................11
Location (4.1)......................................................16
Lubrication (see 5.1.1, 5.2 and 6.2.3)
Lubrication schedule (5.2.4)..................................24
Maintenance (6)...................................................28
Maintenance schedule (6.2)..................................28
Nomenclature (3.2)..............................................13
Nameplate (1.7.1)..................................................8
Operating limits (3.5.1).........................................14
Ordering spare parts (6.3.1)..................................31
Parts lists (8.4) ....................................................43
Performance (3.5)................................................14
Piping (4.6)..........................................................18
Pre-commissioning (5.1).......................................22
Protection systems (4.9).......................................22
Pump masses (2.2.2)...........................................11
PAGE
Reassembly (see 6.10, Assembly)........................37
Receipt and unpacking (2.1).................................10
Recommended fill quantities (see 5.2.3)................23
Recommended grease lubricants (5.2.2)...............23
Recommended oil lubricants (5.2.1)......................23
Recommended spares (6.4).................................32
Recycling (2.5) ....................................................12
Replacement parts (see 6.3 and 6.4).....................31
Running the pump (5.7)........................................25
Safety action (1.6.3)...............................................5
Safety markings (1.6.1)..........................................5
Safety, protection systems (see 1.6 and 4.9)
Sectional drawings (8.1).......................................40
Sound level (see 1.9, Noise level)...........................9
Sources, additional information (10.3)...................45
Spare parts (6.3)..................................................31
Specific machine performance (1.8)........................8
Starting the pump (5.6).........................................25
Stop/start frequency (5.7.6)..................................26
Stopping and shutdown (5.8)................................27
Storage, pump (2.4).............................................12
Storage, spare parts (6.3.2)..................................32
Supplementary manuals or information sources.....45
Thermal expansion (4.5.1)....................................17
Tools required (6.5)..............................................32
Torques for fasteners (6.6)...................................32
Transport (2) .......................................................10
Trouble-shooting (see 7)......................................38
Vibration (5.7.5)...................................................26
Warning labels (1.7.2)............................................8
Kommentare zu diesen Handbüchern