Flowserve OR 52-5 Bedienungsanleitung Seite 23

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 48
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 22
23
Commissioning Procedure
continued
First Commissioning
1. Switch on measuring transducer
(disconnecting switch).
2. Rinse measuring transducer ORG 12/22 for at
least 15 minutes and operate cleaning device
if necessary.
3. Make sure that the ORG 12/22 is completely free of
air. For visual inspection undo union nuts (inside) and
remove light receiver . When screwing the light
receiver in again make sure that the locating pin
fits exactly in the corresponding groove at the front
collar of the light receiver .
0% Calibration
Use tap water (with low fluid temperature) or oil-free condensate as turbidity zero.
1. Press until yellow P-LED lights up.
2. Use to change the LED display until the
calibration LED 0 lights up. The calibration value
(digits) saved last will be indicated.
3. Press , the yellow P-LED and the 7-segment
display are flashing.
4. Press , the 0 % value is saved as basic turbidity.
The P-LED and the 7-segment display are illuminated.
If the basic turbidity is too high an error message
will pop up.
5. Press , the equipment returns to normal operation, 0 ppm is indicated and the LED
for ppm is illuminated.
To cancel press twice, the yellow P-LED will light up again.
ALARM
12
ppm
sec
cal
0
OIL
Tes t
P
E
H
D
D
ALARM
12
ppm
sec
cal
0
OIL
Tes t
P
E
P
P
E
E
P
Seitenansicht 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 47 48

Kommentare zu diesen Handbüchern

Keine Kommentare