Repair InstructionsISCFlow Solutions DivisionISC2PPDual Pusher Seal
4.19 Place the sleeve collar 9onto the end of the sleevewith the “Flowserve” logofacing up. Align the quarterdog set screws with thesmaller holes in
5 Static Testing5.1 Flowserve manufacturing typically tests the ISC at 25 psig. A pressure dropof less than one pound at 25 psig is acceptable. To sta
TO REORDER REFER TOB/M #F.O.FIS137ORG 06/00 USAFlowserve Corporation Flow Solutions DivisionPrinted in U.S.A.ISO 9000CertifiedGermanyBrazilMexicoKalam
2© Copyright 2000 Flowserve Corporation1 NomenclatureNotes: - Inboard stator (3A) is interchangeable with outboard stator (3).- Inboard mating ring (
3.2 Gland Assembly 1 (Figure 2)1 Registered Trademark of Loctite Corporation33 Inspection and Reconditioning2 DisassemblyWhen disassembling seal,
43.4 Inner Gland 1B (Figure 4)A Dynamic O-ring surface - Inspectfor wear, fretting, nicks, scratches,or corrosion. Required surfacefinish: 32 RMSB
4.4 Place the sleeve assembly SL on a flat surface with thecollar end facing up. Installthe inboard vibration dampener M1 into the sleeve end housin
4.5 Align the two flats on theinboard mating ring 3C withthe two flats on the inside ofthe drive ring 10A in thesleeve end housing, andpress the m
74.9 Place the stator and statorcarrier assembly face downonto the sleeve/mating ringassembly. (Figure 11)4.10 Place the inboard dynamicO-ring P1 in
4.11 Place the inner gland O-ring G1 into the face groove inthe inner gland. (Figure 14)4.12 Place the rotor carrier O-ring 11A in the smallest diam
4.15 Insert the outboard vibrationdampener M into the rotorcarrier. Make sure that thevibration dampener is fullyseated at the bottom of therotor ca
Kommentare zu diesen Handbüchern