Flowserve LRR1-40 TDS Control Unit Bedienungsanleitung Seite 26

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 38
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 25
26
Operation continued
Performance test for relays 1 and 4
Press button briefly.
LED 1 and 4 are flashing rapidly.
LED 4 is illuminated during intermittent boiler
blowdown.
The test mode remains active for 10 seconds.
Press button .
As long as the button is pressed down LED 1 is lit
and relay contact 1 opens (MAX limit).
Press button . As long as the button is pressed
down LED 4 is lit and relay contact 4 opens (MIN
limit).
When automatic intermittent boiler blowdown is
active:
Press button . As long as the button is pressed
down LED 4 is lit and relay contact 4 closes (intermittent blowdown valve opens).
Test
Test
Test
Seitenansicht 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 37 38

Kommentare zu diesen Handbüchern

Keine Kommentare