Flowserve NRGS 11-1 Bedienungsanleitung Seite 11

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 20
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 10
11
Installation – continued –
Table 1
NRGS 16-1S
9. Check seating surfaces and place flat gasket on connection standpipe.
0. Place blind flange with bore together with level electrode onto connection
standpipe and fix with bolts. Tighten bolts in diagonally opposite pairs. Fig. 4
1
Function
e. g. First low-level alarm
e. g. Feed pump ON
e. g. High level alarm
e. g. Fee pump OFF
Function
Electrode tip
3
4
2
1
Length [mm]
Attention
The seating surfaces of the threads or flange provided on the vessel or
boiler standpipe must be accurately machined. Fig. 5
Do not bend electrode tip when mounting.
Do not lag electrode body.
Note
For the approval of the boiler standpipe with connecting flange the
relevant local and national regulations must be considered.
See four examples of installation on page 19.
Tools
Open-end spanner 41 mm A. F. to DIN 894
Bolt cutter
Hacksaw
Flat file, medium cut
Please enter length and function.
D
Seitenansicht 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 19 20

Kommentare zu diesen Handbüchern

Keine Kommentare