Flowserve URB 2 Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Hardware Flowserve URB 2 herunter. Flowserve URB 2 User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - GESTRA Steam Systems

1URB 2Installation Instructions 81860100Operating & display unit URB 2GESTRA Steam Systems

Seite 2 - Contents

10Functional Elements – continued –URB 2 – continued –Fig. 4B CD1 Pushbutton2 Navigation wheel3 Illuminated LCD display, resolution 320 x 240 pix

Seite 3 - Contents – continued –

11WiringBus cable, cable length and sizeTo connect the equipment use the supplied M12 connecting sockets.Note that screened multi-cored twisted-pair c

Seite 4

12Wiring – continued –Wiring diagram for CAN bus system – example –Attention Wire equipment in series. Star-type wiring is not permitted! Connect

Seite 5 - Explanatory Notes

13OperationOperator interfaceThe operating and display unit URB 2 shows parameters, operating conditions and other operating data. The menus can be se

Seite 6

14Operation – continued –MenusThe start window in the display shows all possible indications and readings. Note that the system configuration determin

Seite 7 - Technical Data

15Operation – continued –Specification of keys and navigation wheelThe functions allocated to the keys and the navigation wheel of the operating and d

Seite 8 - Technical Data – continued –

16Operation – continued –Specification of the symbol bar – continued –Key Designation Function Forward Proportional increase of values Backwa

Seite 9 - Functional Elements

17Menu StartStart logoThe start logo appears for approx. 2 minutes after restarting the equipment. During this period the parameters of the equipment

Seite 10 - – continued –

18Menu Start – continued –Language1. To set the parameter press button . The activated item is highlighted in the symbol bar. The background of the

Seite 11 - 3 234512 154

19Baud rate250kBd125kBdold:new:Used baud rateBrightnessBackground illuminationMIN MAXContrast of the screenMIN MAXMenu Start – continued –Baud rate

Seite 12 - Basic Settings

2ContentsUsage for the intended purpose ...

Seite 13 - Operation

20About URB 2Device: URB2Version: 311.131.xxDate:July2005Home Control LimiterService menuLock URB Unlock URB Key checkService – Lock URBLock URB now?

Seite 14 - Operation – continued –

21Menu Start – continued –Service – Unlock URB 1. To enable the functions of the keys enter your password and press the navigation wheel. The messag

Seite 15

22Menu Start – continued –Service – Key check1. To check the function of the keys press (and hold down for some time) one key after the other. While

Seite 16 - – continued –

23Menu Control – continued –ControlFunctionNRG 16-42 - LevelNRG 26-40 - LevelLRG 1x-4x - ConductivityTRV 5-40 - TemperatureStatusONONONONHome Control

Seite 17 - Menu Start

24NRS 2-40Overview Status report Measuring range045%1: 080 %2: 060 %3: 040 %4: 020 %LRR 1-40Overview Status reportControl param.µS/cm000%VOp.: 000 %MA

Seite 18 - Menu Start – continued –

25TRS 5-40 - Temperature switchOverview Control SwitchpointsChannel 1:Alarm:Channel 2:Control MAX:Control MIN:Alarm:000 °C000 °C000 °C000 °C000 °C000

Seite 19

26Device nameStatus report Sensitivity Switching timesSensitivity0.5 µS/cm 10 µS/cmDevice nameStatus reportMeasuring rangeSwitchpointsCalibration

Seite 20

27Device nameMeasuring rangeSwitchpoints Switching times045%1: 080 %2: 060 %3: 040 %4: 020 %Device nameStatus report SwitchpointsOutput 4-20mAChannel

Seite 21

28Menu Control – continued –Switchpoints, proportional rangeNoteThe adjustment range of the respective switchpoint is limited by the switchpoints abo

Seite 22 - Press any key

29Menu Control – continued –Switching timesNoteFor more information on energising and deenergising times (conductivity and capacitance level contro

Seite 24 - Control param

30Menu Control – continued –Control valveNoteFor more information on the CANopen actuator see chapter Glossary page 42.Concerning: Level control NR

Seite 25

31Menu Control – continued –Control param.NoteFor more information on continuous boiler blowdown, measuring range (conductivity control), proportiona

Seite 26

32Menu Control – continued –Blowdown valveNoteFor more information on the operating position of the continuous blowdown valve, 24hours purging pulse

Seite 27

33Menu Control – continued –MIN/BlowdownNoteFor more information on continuous boiler blowdown see chapter Glossary page 42.Concerning: Conductivit

Seite 28

34Menu LimiterLimiterNoteThe control units NRS 1-40 and NRS 1-40.1 must not be used in parallel in a CAN Bus system.The monitored equipment together w

Seite 29

35Menu Limiter – continued –Control unitNoteFor a list of all status messages for the equipment refer to chapter Status messages Limiter (see page 39

Seite 30

36MalfunctionsCausesNoteBefore carrying out the systematic fault finding procedure please check:Wiring: Is the wiring in accordance with the wiring dia

Seite 31

37Systematic fault finding procedure for system malfunctionsThe sources of malfunctions occurring in CAN bus systems operating with several bus-based s

Seite 32

38Malfunctions – continued –RestartNoteAll values indicated by the URB 2 will be updated within 2 minutes.1. Press the navigation wheel to restart t

Seite 33

39Malfunctions – continued –Status messagesNoteThe system message “T MAX exceeded” is given when the ambient temperature is excessively high. Note t

Seite 35 - Menu Limiter – continued –

40AnnexCAN busAll devices (level, conductivity, temperature) are interconnected via CAN bus. The CANopen protocol is used for the data exchange betwee

Seite 36 - Malfunctions

41 Declaration of ConformityAnnex – continued –We hereby declare that the operating and display unit URB 2 conforms to the following European guideli

Seite 37 - Check next system

42GlossaryContinuous boiler blowdown (“top blowdown”): As the boiler water evaporates, the concentration of non-volatile dissolved solids (TDS) left b

Seite 38 - Operational

43Glossary – continued –Energizing times (conductivity and capacitance level control): For each of the four output relays individual time delays for

Seite 39 - Malfunctions – continued –

44Glossary – continued –Cell constant (conductivity control): The cell constant is a geometric quantity characteristic of the level electrode and is

Seite 42 - Glossary

47For your notes

Seite 43 - Glossary – continued –

48818601-00/806cm · 2005 GESTRA AG · Bremen · Printed in GermanyGreat BritainFlowserve Flow Control (UK) Ltd.Burrel Road, Haywards HeathWest Sussex RH

Seite 44

5Important NotesUsage for the intended purposeThe operating & display unit URB 2 may only be used in conjunction with GESTRA CAN bus devices.Any t

Seite 45 - For your notes

6Explanatory Notes – continued –System description – continued –Level Conductivity TemperatureActual value bar chart XActual value, numerical X X XM

Seite 46

7URB 2Technical DataInput/output CAN bus interface with power supply 18-36 V DC, short circuit protectedData exchange CAN bus to ISO11898, CANopen p

Seite 47

8DimensionsTechnical Data – continued –Fig. 2IP 54MAX 55 °CMAX 55 %E [mm]F [mm]174 145PUSH30max. 10EHome Control LimiterLevel45 % PressureMAXACT.

Seite 48 - GESTRA AG

9InstallationURB 2Fig. 3Functional ElementsURB 2The operating and display unit URB 2 is designed for installation in control cabinets.1. Provide cut

Kommentare zu diesen Handbüchern

Keine Kommentare