CW
Rotation
F
D
F
Q
CCW
Rotation
11
3.2 Use ush port that coincides with gland markings and direction of
equipment rotation. Plug extra NPT opposite of ush. See Figure 7.
3.3 Taps Q and D in the gland are quench and drain ports used for
uid quenching, ush plan 62. If they are not used, they should be
plugged with pipe plugs.
3.4 Remove lock outs on pump and valves.
3.5 Do not start up the equipment dry to check motor rotation or for any
other reason. Open valves to ood pump with product uid. Ensure
that the seal ush system is operating. Vent air from the casing of
the pump and the seal chamber before start-up.
3.6 Observe the start-up. If the seal runs hot or squeals, check the
seal ush system. Do not allow the equipment to run for any
extended time if the seal gets hot or squeals.
4 Dual Seal Piping and Operational Recommendations
4.1 Flush taps a and b in the gland are barrier uid inlet and
outlet ports. Use Figure 8 to determine which ports to use as inlet
and outlet.
a
b
Shaft rotation from exposed end of gland Figure 8
Inlet Outlet
Clockwise (CW) Port b Port a
Counterclockwise (CCW) Port a Port b