Installation InstructionsST Series Experience In MotionST/QBM, ST/MRA, ST
21 Equipment Check1.1 Follow plant safety regulations prior to equipment disassembly: • ConsulttheplantMaterialSafetySheet(MSDS)les
3 • Bearing,drive,andcouplingmustbeingoodcondition • Maximumverticalshaftmovement(axialendplay)=0.13mm(0.005inch)FIM •
41.10Pressure testing of the ST/QBM, ST/MRA, ST cartridge canister dual seal prior to installation is possible but not necessary.Ifpressuret
5Centering and Attachment Screws Figure 3Itisessentialthatbeforetighteningboltsthemotor/gearbox/sealassembly center of mass be found and t
Shoulder screws 57.2 are designed to hold the rotating portion of the seal in proper position to the stationary housings during installation.The
3 Seal OperationToassurereliablenoisefreeoperationofthissealingproduct, the following operating guide must be observed.3.1 Maintain bar
TOREORDERREFERTOB/M#F.O.FIS167eng Rev 8/13 Printed in USAflowserve.comTo find your local Flowserve representativeand find out more about Flowserve Co
Kommentare zu diesen Handbüchern